Vacuum Steam Test Results
First System Start Up - Achieved November, 2022 - Proof of Concept
Electrical and Thermal Efficiency Tests to Follow - Stay Tuned!
Compressed Air Test Results
Achieved August, 2022
Brushless Electricity Generator Dyno Test
10 inch Tesla Turbine 0 - 9,500rpm run on 150 psi via a 170 gal tank, dual 1/2 inch supply lines
Power generated: 2.75kW / 6.22 ft-lbs